We know the origin of this software and the credentials of its developers, no other product compares within our industry, running software since 2005
- Mike Bonomelli, Melbon Sheet Metal (WA) Electrical Control Cabinets Assembly & Laser

Redthorn welcomes Denis, the newest member of our technical and software team.

Denis has a systems engineering background and has previously used ERP/MRP software so he is getting up to speed with our systems and processes very quickly.

He is already proving to be a great member of the team.

New Redthorn System...

ILC Restructure at Gardner - A New Case Study

The Need: The 35,000 square foot ILC in Derby had evolved over time as new projects were introduced and volumes increased. The growth of the centre in this way created constraints on the business. There was a lack of room for storage for finished parts and media for kitting. This meant there was no room for expansion of new or existing customers. There was non-value added activities taking place and skills were not transferable between customers’ kitting, assembly and quality assurance operations. Inefficiency of material flow around the shop floor and no overall conceptual plan existed guiding development. Standard operating procedures were also not in place for kitting and quality assurance.

In addition to the physical layout of the ILC, the facilities director Paul O’Gara also recognised that whilst the workforce was highly skilled and very flexible, there was a need for an organisational restructure to create more effective job roles and a better level of overall accountability.

Read the whole case study on our website and download the PDF.

New Case Study

Demand Signal Analysis at Gardner

The Need: Gardner receive demand signals from their Aerospace customers in a variety of electronic formats and at different times of the week. Paul O’Gara, Director of the Integrated Logistics Centre recognised that the individual signals were being managed in different ways operationally as well as through Gardner’s internal MRP systems. This was leading to inefficiencies in the sales and operations process which in turn was leading to a dilution of the quality of the signal as it was output to each of the companies’ manufacturing centres.

Read the full case study online

You can also download PDF.

New Case Study


Problem Solving at Gardner

Client Overview

Gardner Aerospace’s activities include 5-axis machining, turning, sheet metal fabrication, non-destructive testing, surface treatments, final assembly and kitting. Gardner’s Integrated Logistics Centre (ILC) manages the delivery of the Group’s manufactured and bought-in products to its key customers, either delivered individually or as kits.

The Need

Most of the actions taken to mitigate issues and problems on the shop floor were immediate actions that recovered the situation but did not deal with the root cause of the issue or problem. As a consequence the same issues and problems were re-occurring causing operational disruption.

The Approach

The primary goal was to establish a simple process that the management team and the workforce could use to jointly establish root cause problem solving on a routine basis. The intervention consisted of three steps.


Read the full case study on the Redthorn website.

Alternatively you can download the PDF.

Swift responses to queries and fantastic support is now available to Western Australia throughout the day and fifty two weeks a year
- Glenn Hoskins, Rollwell (WA) Steel Rolling, Pressing and Fabricating

New Case Study…

Change Management at Addison Engineering

The Need: The management team were concerned at the perceived low level of morale in the workforce and the negative feedback that accompanied the implementation of improvements and strategic activities. Before the workforce could be engaged in change and shop-floor problem solving the management team needed to know the current issues affecting employee performance.

Download the PDF and read the whole case study from our website today.

Contact our team for more information on our solutions and services.

Older Posts

Custom Post Images

Stacks Image 6099
Stacks Image 6100
Stacks Image 6101
Stacks Image 6102
Stacks Image 6103
Stacks Image 6104
Stacks Image 6105

Don’t just take our word for it

Our software supports over 600 engineering and manufacturing businesses worldwide.
Visit the Knowledge Centre for more information or contact us to talk about how we can help your business grow.

Redthorn Social Media